{"id":11649,"date":"2023-08-21T11:31:30","date_gmt":"2023-08-21T04:31:30","guid":{"rendered":"https:\/\/sonha.com\/project\/nha-may-thuy-dien-son-la\/"},"modified":"2025-08-18T12:38:25","modified_gmt":"2025-08-18T05:38:25","slug":"nha-may-thuy-dien-son-la","status":"publish","type":"project","link":"https:\/\/sonha.com\/en\/project\/son-la-hydropower-lant\/","title":{"rendered":"Son La Hydropower Plant"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Content<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/sonha.com\/en\/project\/son-la-hydropower-lant\/#INSTALLATION_OF_AUTOMATIC_BOLLARD_SYSTEM_AT_SON_LA_HYDROPOWER_PLANT_%E2%80%93_A_NATIONAL_STRATEGIC_PROJECT\" >INSTALLATION OF AUTOMATIC BOLLARD SYSTEM AT SON LA HYDROPOWER PLANT \u2013 A NATIONAL STRATEGIC PROJECT<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/sonha.com\/en\/project\/son-la-hydropower-lant\/#Project_overview_of_Son_La_Hydropower_Plant\" >Project overview of Son La Hydropower Plant<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/sonha.com\/en\/project\/son-la-hydropower-lant\/#Automatic_Bollard_Solution_for_Son_La_Hydropower_Plant_by_Sonha_Auto\" >Automatic Bollard Solution for Son La Hydropower Plant by Sonha Auto<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"INSTALLATION_OF_AUTOMATIC_BOLLARD_SYSTEM_AT_SON_LA_HYDROPOWER_PLANT_%E2%80%93_A_NATIONAL_STRATEGIC_PROJECT\"><\/span>INSTALLATION OF AUTOMATIC BOLLARD SYSTEM AT SON LA HYDROPOWER PLANT \u2013 A NATIONAL STRATEGIC PROJECT<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Project_overview_of_Son_La_Hydropower_Plant\"><\/span>Project overview of Son La Hydropower Plant<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Located in Son La province, the Son La Hydropower Plant is the largest hydroelectric facility in Vietnam and Southeast Asia. It has an installed capacity of 2,400 MW across 6 units (6 x 400 MW) and an average annual output of 10.246 billion kWh. The plant plays a crucial strategic role in supplying electricity to the national grid, ensuring energy security, and driving socio-economic development.<\/p>\n<p>Due to its significant scale and importance, the Son La Hydropower Plant demands the strictest security measures. Tight access control and prevention of any unauthorized entry are top priorities to ensure absolute safety for this key national asset.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Automatic_Bollard_Solution_for_Son_La_Hydropower_Plant_by_Sonha_Auto\"><\/span>Automatic Bollard Solution for Son La Hydropower Plant by Sonha Auto<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>To meet high-level security standards and enhance vehicle control at Son La Hydropower Plant, Sonha Auto was entrusted with implementing a modern automatic bollard system.<\/p>\n<p>Automatic <a href=\"https:\/\/sonha.com\/en\/barrier-bollard\/bollard\/\">bollards<\/a> provide an optimal solution that matches the plant\u2019s stringent security requirements by effectively preventing unauthorized intrusions and flexibly managing vehicle traffic. The bollard system features high impact resistance and durability under all weather conditions, with the option for automatic or manual operation when necessary.<\/p>\n<figure id=\"attachment_11644\" aria-describedby=\"caption-attachment-11644\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-11644 size-full\" title=\"Automatic bollards installed at Son La Hydropower Plant\" src=\"https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la.jpg\" alt=\"Automatic bollards installed at Son La Hydropower Plant\" width=\"800\" height=\"600\" srcset=\"https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la.jpg 800w, https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-300x225.jpg 300w, https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-11644\" class=\"wp-caption-text\">Automatic bollards installed at Son La Hydropower Plant<\/figcaption><\/figure>\n<p>Specifically, Sonha Auto installed a system of 6 automatic vehicle <a href=\"https:\/\/sonha.com\/en\/barrier-bollard\/bollard\/?_brand=bft-italy\">bollards BFT<\/a> model STOPPY B 200\/700, at the Son La Hydropower Plant \u2013 the largest hydroelectric facility in Southeast Asia. The STOPPY B \u00d8200-700 system features bollards with a diameter of 200mm and a raised height of 700mm. Each bollard is equipped with integrated indicator lights on top and reflective strips to enhance visibility and safety during nighttime or low-light conditions.<\/p>\n<p>With an impact resistance of up to 110,000 Joules &#8211; capable of withstanding high-speed vehicle collisions and an IP67 protection rating (fully dust-tight and temporarily submersible), this system ensures maximum security and safety for Son La Hydropower Plant. It effectively prevents unauthorized access, protecting both assets and personnel.<\/p>\n<figure id=\"attachment_11638\" aria-describedby=\"caption-attachment-11638\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-11638 size-full\" title=\"Automatic vehicle bollards at Son La Hydropower Plant\" src=\"https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-2.jpg\" alt=\"Automatic vehicle bollards at Son La Hydropower Plant\" width=\"800\" height=\"600\" srcset=\"https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-2.jpg 800w, https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-2-300x225.jpg 300w, https:\/\/sonha.com\/wp-content\/uploads\/2025\/07\/thuy-dien-son-la-2-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-11638\" class=\"wp-caption-text\">Automatic vehicle bollards at Son La Hydropower Plant<\/figcaption><\/figure>\n<p>With over 20 years of experience in deploying automated security systems, Sonha Auto has established itself as a leading provider in Vietnam. We have successfully completed numerous high-security projects, including <a href=\"https:\/\/sonha.com\/en\/project\/russian-embassy\/\">the Russian Embassy<\/a>, major airports, industrial plants, and national commercial centers. Notably, Sonha Auto is proud to partner with Son La Hydropower Plant, helping protect this strategic asset with modern, safe, and sustainable technology solutions. We remain committed to delivering optimal security solutions for future key projects.<\/p>\n","protected":false},"featured_media":11648,"template":"","meta":{"_acf_changed":false},"project-category":[108],"project-field":[112],"project-product":[120,119],"class_list":["post-11649","project","type-project","status-publish","has-post-thumbnail","hentry","project-category-project","project-field-factories","project-product-barrier-parking-bollard","project-product-security-control"],"acf":[],"_links":{"self":[{"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/project\/11649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/media\/11648"}],"wp:attachment":[{"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/media?parent=11649"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/project-category?post=11649"},{"taxonomy":"project-field","embeddable":true,"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/project-field?post=11649"},{"taxonomy":"project-product","embeddable":true,"href":"https:\/\/sonha.com\/en\/wp-json\/wp\/v2\/project-product?post=11649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}